October has been an exciting month for progress over at our Owlstone Croft site. At the start of October, we marked a major milestone by hosting a topping-out ceremony to celebrate reaching the full height of the first of four new timber-framed postgraduate accommodation terraces.
29th October 2026

The new terraces are a big step forward for the Queens’ postgraduate community. Owlstone Croft rethinks the classic student accommodation design in favour of something closer to a neighbourhood, a place for students to genuinely feel at home during their time here.
Postgraduates may live in these homes for multiple years, and the architecture is designed to support that extended period of living, working and personal growth. Bedrooms are deliberately generous, each exceeding 25m², with a north-facing sleeping area that opens onto a larger south-facing study and living space. This dual-aspect arrangement maximises natural light while giving students room to settle in and adapt the space to their needs over time.
The four- and five-bedroom houses are set within shared gardens, ensuring students have an outdoor space that feels like their own. Each house has its own front door and a communal kitchen, dining and living space at ground level.

Accessibility was at the forefront of the design process for the terraces, with step-free access and platform lifts integrated throughout. All bedrooms are designed to be accessible to wheelchair users. There will be a total of 13 lifts across the terraces, one per house, creating homes that are welcoming and accessible for all.

Designed to reflect the character of traditional terraced housing, the architecture takes its cues from the surrounding streets. Articulated gables and varied rooflines keep the buildings in scale with Newnham’s residential horizon.
Sustainability is built in from the ground up. The new homes are designed to Passivhaus standards, achieving net-zero operational carbon, through a fabric-first approach that prioritises thermal performance, daylight and comfort.

To honour those whose generosity makes this vision possible, we have a range of naming opportunities for the terraces. If you would like to find out more, you can visit our dedicated Bridge to the Future website or contact our fundraising team at development@queens.cam.ac.uk.

It has been an exciting month on site as the new spaces begin to come to life. The timber frame for the new entrance and common room is now up in Block A, walking through the new study space gives a real sense of it’s scale and the generous natural light that will make it a lovely environment to work in. In Block B, rooms are feeling much closer to home as painting, flooring, and vanity units go in on the upper floors. Meanwhile across the Terraces, internal framing and lift installations are making great progress, and the new electrical substation is now safely positioned.

Over the next month, the site will look dramatically different from the outside. Across the Terraces, scaffolding will start coming down, revealing the exterior brickwork as it takes shape and starts to give a true feel for the finished buildings. In Block A, focus will turn to fitting out and enclosing the new common room, entrance, and study areas. In Block B, interior teams will be putting the finishing touches on doors, bathrooms, and final painting across all floors. Finally, we’ll begin preparing the surrounding grounds for landscaping as we move closer to bringing the whole campus together.
Be part of what comes next:
Despite the dedicated work continuing at Owlstone Croft, we still need your help. The future of Owlstone Croft relies on the generosity of Queens’ members and friends. Every donation counts.
If you would like to find out more about the project, donate, or speak to someone about how your generosity could help, contact our fundraising team at development@queens.cam.ac.uk or visit bridgetothefuture.co.uk
Owlstone Croft forms part of our 10-year-long campaign, Bridge to the Future.
Find out more at bridgetothefuture.co.uk
With thanks to:
Architect: Mikhail Riches
Contractor: Morgan Sindall

Queens’ College will be commencing a 20-week planned maintenance and repair programme on its river walls along the River Cam.
2nd November 2026

Back in 2021, Queens’ College partnered with IntoUniversity to launch the IntoUniversity Bradford East learning centre. Since opening in Holmewood in 2021, the centre has worked with over 3,000 young people, helping them develop academic skills, build confidence and explore their interests, education and career options.
28th October 2026

Last week, we marked a major milestone at Owlstone Croft with a topping out ceremony, celebrating the structural completion of the first new postgraduate accommodation terrace.
5th October 2026

We are pleased to share that we are now over halfway through our ambitious transformation of Owlstone Croft. With one year of the work completed and one more to go, we wanted to take this opportunity to reflect on the progress so far and look ahead to what the completed development will offer our students and the wider College community.
24th September 2026
Site Search